[1] B Liu, Z J He, H Jin.Wind power status and development trends.Journal of Northeast Dianli University, 2016, 36(2): 7-13. [2] W Q Cao.Research on wind power consumption in China.Journal of Electrical Engineering, 2014(6): 42-45. [3] Y C Wang.Summary of the development of wind power system technology.Information Recording Materials, 2017, 18(5): 27-28. [4] H Li, Y S Xue, L Han.Overview of development of grid- connected wind power generation systems.Micro Motor, 2009, 37(5): 55-61. [5] J L Lin, S J Hu, D G Kong, et al.Studies on the low voltage ride through capability of fully converted wind turbine with PMSG.Automation of Electric Power Systems, 2008(19): 92-95. [6] J Zhang.Analysis of control status and development trend of voltage source PWM rectifier.Journal of Electrical Engineering, 2018, 13(10): 29-34. [7] F Xu, H Wang, T Y Yang.Research on power conversion technique in MW-level direct-driven wind turbine.Electric Power Automation Equipment, 2007(7): 57-61. [8] Y Liu, X Zhu, Q Shi, et al.Research of wind farm LVRT characteristics based on set electricity lines.East China Electric Power, 2012, 40(9): 1540-1543. [9] GB50545-2010 110 kV~750 kV Overhead transmission line design specification. [10] H Lin, Q Chao.Simulation and analysis of transient characteristics of grid-connected direct-drive wind power system.Electric Power Automation Equipment, 2010, 30(11): 1-5. [11] Y Z Wu, L Wang, E Y Tian, et al.An improved Monte Carlo method to research on route optimization for inspecting of electricity substation.Electronic Design Engineering, 2019, 27(12): 89-93, 98. [12] L Xu.Availability analysis of typical power distribution architecture in data center based on Monte Carlo Method.Electrical and Energy Efficiency Management Technology, 2018(17): 54-57. [13] GB∕T 19963-2011 Wind farm access to power system technical regulations. [14] X Q Fan, H Li, Q T Guo, et al.Comprehensive evaluation of wind farms low-voltage ride-through performance based on intimate data method.Journal of Electrical Engineering, 2016, 11(10): 13-18. [15] Y Q Meng, J Wang, L Li, et al.New low voltage ride-through coordinated control schemes of permanent magnet synchronous generator considering rotor speed limit and DC discharging circuit optimization.Proceedings of the CSEE, 2015, 35(24): 6283-6292. [16] NB 31026-2012 Wind farm engineering electrical design specification. [17] X J Shen, C C Zhou, H Lü.Review on grouping method of large wind farm wind turbine generators.Journal of Electrical Engineering, 2016, 11(5): 1-10. [18] L Zhu, X W Xu, X X Wang.Modeling and simulation of permanent magnet direct-driven wind power generation system based on Matlab/Simulink.Power System and Clean Energy, 2011, 27(9): 93-99. [19] Y Q Jin, H Huang, P Ju, et al.Collector network transformation methods for wind farm aggregated modeling.Power System Protection and Control, 2012, 40(16): 34-41. [20] W Zhang, J He, Q Li, et al.Research on capacity configuration method of concentrated reactive power compensator for wind farm LVRT capability.The Journal of Engineering, 2017(13): 2428-2432. |