[1] G Wu, G Gao, W Wei, et al.The current collection approach of high-speed train-pantograph and catenary system, in the electrical contact of the pantograph-catenary system. 1st ed. Singapore: Springer, 2019. [2] J H Lee, T W Park, H K Oh, et al.Analysis of dynamic interaction between catenary and pantograph with experimental verification and performance evaluation in new high-speed line.Vehicle System Dynamics, 2015, 53(8): 1117-1134. [3] G Wu, W Wei, G Gao, et al.Evolution of the electrical contact of dynamic pantograph-catenary system.Journal of Modern Transportation, 2016, 24(2): 132-138. [4] Z Yang,B Tang,Y Qiu, et al.Measurement of transient temperature using laser-induced breakdown spectroscopy (LIBS) with the surface temperature effect.Journal of Analytical Atomic Spectrometry, 2023, 38(10): 1952-1961. [5] Z Dai, T Li, N Zhou, et al.Numerical simulation and optimization of aerodynamic uplift force of a high-speed pantograph.Railway Engineering Science, 2022, 30(1): 117-128. [6] A C Hernandez, J D D S Bobi, J G Fernandez, et al. Vibration reduction on overhead contact rails: A simulation-optimization approach.International Journal of Simulation Modeling, 2021, 20(2): 315-326. [7] M Simarro, S Postigo, M Prado-Novoa, et al.Analysis of contact forces between the pantograph and the overhead conductor rail using a validated finite element model.Engineering Structures, 2020, 225(2020): 111265. [8] H Zhou, Z Liu, J Xiong, et al.Characteristic analysis of pantograph-catenary detachment arc based on double-pantograph-catenary dynamics in electrified railways.IET Electrical Systems in Transportation, 2022, 12(4): 238-150. [9] E Chater, D Ghani, F Giri, et al.Output feedback control of pantograph-catenary system with adaptive estimation of catenary parameters.Journal of Modern Transportation, 2015, 23(4): 252-261. [10] G Wu, K Dong, Z Xu, et al.Pantograph-catenary electrical contact system of high-speed railways: Recent progress, challenges, and outlooks.Railway Engineering Science, 2022, 30(4): 437-467. [11] M T Stickland, T J Scanlon.An investigation into the aerodynamic characteristics of catenary contact wires in a cross-wind.Journal of Rail and Rapid Transit, 2001, 215(4): 311-318. [12] M T Stickland, T J Scanlon, I A Craighead, et al.An investigation into the mechanical damping characteristics of catenary contact wires and their effect on aerodynamic galloping instability.Journal of Rail and Rapid Transit, 2003, 217(2): 63-71. [13] W Liu, Y Wang, T Wang, et al.Influence of offline time on the characteristic of arc between pantograph and catenary.High Voltage Engineering, 2016, 42(11): 3524-3532. [14] G Wu, Y Zhou, G Gao, et al.Arc erosion characteristics of Cu-impregnated carbon materials used for current collection in high-speed railways.IEEE Transactions on Components, Packaging and Manufacturing Technology, 2018, 8(6): 1014-1023. [15] Y Song, Z Liu, H Wang, et al.Nonlinear analysis of wind-induced vibration of high-speed railway catenary and its influence on pantograph-catenary interaction.Vehicle System Dynamics, 2016, 54(6): 723-747. [16] Z Xu, Y Song, Z Liu.Effective measures to improve current collection quality for double pantographs and catenary based on wave propagation analysis.IEEE Transactions on Vehicular Technology, 2020, 69(6): 6299-6309. [17] International Union of Railways. UIC CODE 799. Characteristics of a.c. overhead contact systems for high-speed lines worked at speeds of over 200 km/h. Paris: International Union of Railways, 2002. [18] Z Liu, Y Song, Y Han, et al.Advances of research on high-speed railway catenary.Journal of Modern Transportation, 2018, 26(1): 1-23. [19] Y Song, Z Liu, H Wang, et al.Nonlinear modelling of high-speed catenary based on analytical expressions of cable and truss elements.Vehicle System Dynamics, 2015, 53(10): 1455-1479. [20] S Bruni, J Ambrosio, A Carnicero, et al.The results of the pantograph-catenary interaction benchmark.Vehicle System Dynamics, 2014, 53(3): 412-435. [21] Y H Cho, K Lee, Y Park, et al.Influence of contact wire pre-sag on the dynamics of pantograph-railway catenary.International Journal of Mechanical Sciences, 2010, 52(11): 1471-1490. [22] B Zhu, Z Ren, W Xie, et al.Active nonlinear partial-state feedback control of contacting force for a pantograph-catenary system.ISA Transactions, 2019, 91: 78-89. [23] Y Yao, N Zhou, G Mei, et al.Dynamic analysis of pantograph-catenary system considering ice coating.Shock and Vibration, 2020, 2020: 1-15. [24] A Jamaleddine, G McClure, J Rousselet, et al.Simulation of ice-shedding on electrical transmission lines using adina.Computers & Structures, 1993, 47(4-5): 523-536. [25] British Standards Institution.BS EN 50318. Railway applications-Current collection systems-Validation of simulation of the dynamic interaction between pantograph and overhead contact line. London: British Standards Institution, 2018. [26] J Zhang, W Liu, M Yu, et al.Simulation analysis of offline characteristics between pantograph and catenary.IET Electrical Systems in Transportation, 2017, 7(3): 252-257. [27] BS EN 50367. Railway applications-Current collection systems-Technical criteria for the interaction between pantograph and overhead line. London: British Standards Institution, 2012. |